Verify that the scheduled job for updating NVD records is running
Identify the repositories that you want updated regularly. You can execute a scheduled job to update National Vulnerability Database (NVD) records on a nightly or weekly basis. If it is not already running, you can enable the job
Before you begin
Roles required: App-Sec Manager group
The NVD integration runs as a scheduled job daily on Mondays at 00:00:00, by default.
Procedure
Navigate to All > Application Vulnerability Response > Administration > Integrations.
Select the NIST National Vulnerability Database scheduled job.
Verify that the Active check box is selected.
Note: The settings in this form are shared by Vulnerability Response and Application Vulnerability Response. Modifying the integration settings requires coordination with and expertise in Vulnerability Response and ServiceNow.
If the box is selected, you are done.
Note: If the box is not selected, this integration may need to be configured within Vulnerability Response. See Importing data with the NVD and CWE integrations and managing third-party libraries for more information before selecting it.
As needed, see View vulnerability libraries to see the imported entries.
Parent Topic:Configure Application Vulnerability Response