Skip to content
Release: Australia · Updated: 2026-03-12 · Official documentation · View source

Create an IP-based Discovery schedule in Discovery Admin Workspace

Use the Discovery Admin Workspace dashboard to create IP-based Discovery schedules.

Before you begin

Store version: 1.8.0.

Role required: discovery_admin

Procedure

  1. Navigate to Workspaces > Discovery Admin Workspace > Schedules.

  2. Select New Discovery from the header of any tab on the Schedules page.

  3. Select IP-based discovery and select Continue.

    Note: This schedule is only for IP-based Discovery. For Cloud Discovery, see Create a discovery schedule in Cloud Discovery Workspace.

  4. Enter a name for the Discovery schedule.

  5. Choose from available Discovery locations.

  6. Choose IP ranges by either selecting from existing sets or by manually entering the ranges.

    • To select from existing IP range sets, select Use existing IP range set (recommended). See Discovery IP address configuration for more information on IP range sets.
    • To manually enter comma-separated IPv4 address ranges, IPv4 networks, or individual IPs that describe the ranges you want to add, select Enter new IP ranges and enter the IP ranges.
    • Select next.
  7. Choose your MID Server.

    OptionDescription
    Cluster of MID serversSelect an existing MID Server or create one. Clusters provide failover protection and load balancing between MID Servers. See Configure a MID Server cluster for more information.
    Auto-select MID serverAn available MID Server is automatically selected when the Discovery schedule runs. See Automatic MID Server selection for more information.
    MID serverChoose a MID Server to run the Discovery schedule. All MID Server are shown, but only ones that are up and validated can successfully run a Discovery schedule.
  8. Select next.

  9. Configure the Discovery schedule.

    OptionDescription
    Run on demandThe schedule only runs when triggered manually. Trigger the schedule by selecting Finish and run at the end of this setup, or by navigating to the schedule in the Schedules table and selecting Discover Now.
    Run at a scheduled timeThe schedule runs at a scheduled date and time. Use the fields to define when the schedule runs.
    Run after seriesThe schedule runs after another existing Discovery schedule completes, staggering or chaining them together. Selecting an existing schedule displays a relationship map of all the other associated schedules.
    Cancel discovery if longer than maximum runtimeIf the schedule exceeds the maximum runtime, it's canceled. After toggled, configure the runtime threshold.
    Finish and runAfter being selected, all the information provided is validated. Then, a Discovery schedule is created in the background, a Discovery status is created, and the schedule is run. You're redirected to the Status Details page for the schedule.
    FinishAfter being selected, all the information provided is validated. A Discovery schedule is created and you're redirected to its entry in the Discovery Schedules [discovery_schedule] table. You can edit the schedule information or run it by selecting Discover Now.

What to do next

After you create and save a Discovery schedule, you can optionally configure the following settings: