Edit an existing check
By editing the definition check, you can change description and script.
Before you begin
Role required: admin
Procedure
Navigate to Workspaces > Discovery Admin Workspace > Tuning.
Select the check name.
Select the Check definition page link.
To edit the check, select Switch scope.
Update all the required details and select Save.
Note: If the Active option is enabled:
- Discovery suite runs once a week on Sunday at 8 AM.
- MID suite runs once a week on Sunday at 10 AM.
- Self monitoring suite runs every 15 mins.