Create or modify a rate model
Create or modify a rate model that can be linked to a project or demand to determine planned costs and actuals for their resource. The rate model provides date-effective, criteria-driven hourly rates for these investments.
Before you begin
- Choose the attributes to define the criteria in a rate model to derive hourly rates.
- Define the budget reference rates for the non-functional currency for the required time periods.
- Role required: pps_admin or it_rate_model_admin
Procedure
- Create a rate model.
| Option | Steps |
|---|---|
| From Project Administration |
|
| From Time Sheets |
|
- On the form, fill in the fields.
| Field | Description |
|---|---|
| Name | Unique name for the rate model. |
| Active | Option for indicating the status of the rate model. Only active rate models can be assigned to a project or demand. |
| Default | Option for setting the rate model as the default. You can set only one rate model as default. A default rate model is automatically associated to new projects and demands. |
| Rate model context | Context set for the rate model.Read-only system field. |
| Currency | Default currency for the rate lines in the rate model. |
| Rate type | Option for enabling the rate type attribute on rate lines in the rate model.When selected, Rate type is added as one of the attributes along with other defined attributes. For more information, see Rate type in labor rate card. |
| Description | Short description for the rate model. |
- Click Submit.
What to do next
Add attributes from a set of predefined entities to define the criteria for rate model to derive resource cost.
Parent Topic:Rate Models